As part of the renovation, the building will be highly insulated to meet or exceed building regulation standards. The existing windows will be secondary glazed. New external doors will be insulated, and new double glazed rooflights will be installed. Renewables will be installed including: 68m2 of photovoltaics, and modern air source heat pumps. The ventilation system will use heat recovery. Lighting will be 100% LED with sensor-controlled switching.